Knowledge Sharing ePoster Session 6
Thursday, 29 February
Hall 6A Foyer, Level 1
ePoster
-
1530-1550 34979E2E: Well Integrity Improvement Journey and WHCP Evolution
-
1530-1550 34693One of the Largest Volume Deepwater Cementing Operations Performed Globally
-
1530-1550 34673Intelligent Optimisation of Overall Layout for Ultra-Deepwater Subsea Dynamic Umbilicals
-
1530-1550 34558Successful Implementation of Innovative Open Hole Completion Technologies for the Longest ERD Well in India’s Western Offshore Field
-
1530-1550 34658Application of Autonomous Outflow Control Devices to Optimise Three Simultaneous Operations in Monobore Wells, Case Study of Offshore China
-
1530-1550 34688Completion and Workover Riser Connection Qualification for HPHT Applications
-
1530-1550 34998Bien Dong 20-inch Pipeline Span Field Observation and Span Correction
-
1530-1550 34646Pipeline Leak Mechanisms
-
1530-1550 34675Optimising Underwater Inspection For Freespan Threat Via Predictive Analytic Approach
-
1530-1550 34608Advanced Automated Drilling Advisory System Enhances Drilling Efficiency
-
1530-1550 34679Successful Deployment of Large Diameter Hybrid Drill Bit with Optimised Drilling Parameters Leads to Breakthrough in Days Saved