Technical Session 38: Challenges and Advancements in Deepwater Design and Production II
Friday, 1 March
Room 401-402, Level 4
Technical Session
-
0900-0920 34999The New Era of Subsea Production System
-
0920-0940 34635Recent Active Heating Breakthrough and New Opportunities for Deepwater Tie-back
-
0940-1000 34671Challenges and Solutions for Deep water Subsea Pipeline Design: A Case Study on Chinese Longest Distance Multiphase Pipeline Tie-back in LS25-1 Project in South China Sea
-
1000-1020 34554Highlights and Unique Lessons Learnt from Multiple Interventions on a Deepwater Asset in Malaysia.