Technical Session 04: Carbon Reduction: Project/Operations

Wednesday, 28 February
Room 406-407, Level 4
Technical Session
Chairperson
Mohd Taufik Arshad - Technip Energies (M) Sdn Bhd
Danuwas Lambasara, Vice President, CCS Department - PTT Exploration and Production Public Company Ltd.
  • 0900-0920 34718
    Kasawari Carbon Capture And Storage (CCS): Realising The World's Largest Offshore CCS Project Through Effective Front-end Loading
    M. Mohamed Najib, A. A Rahman, M. Zainal Abidin, F.B. A Karim, A. Narayanan, PETRONAS
  • 0920-0940 34711
    Pipeline CO2mmissioning: The First Step Is The Hardest
    S. Stokes, H. Haghighi, C. McKay, John Wood Group PLC
  • 0940-1000 34725
    Powering Rosmari And Marjoram Field Development Project With Renewable Energy
    J. Sio, N. Chan, M. Tawie, Sarawak Shell Berhad
  • 1000-1020 34695
    Offshore CCS - Pre-commissioning Experience And Strategy For Subsea CO2 System
    R.J. Davis, A. Roux, Subsea 7
  • Alternate 34727
    Kasawari CCS Project
    M. Bin Zaini, PETRONAS; N. Manderwad, Baker Hughes; A. Redzuan, Malaysia Marine & Heavy Engineering; M. Ermini, Baker Huges
  • Alternate 34728
    Managing Oil and Gas Industry Emissions Through Carbon Credits
    K. Rana, Oribi Industrial Resources Pvt. Ltd.
  • Alternate 34724
    Enhancing Fuel Efficiency In Onshore Drilling Rigs Through Generator Power Management: A Sustainable Approach To Reduce Diesel Consumption
    I. Choundharabhanich, B. Mekkerdchoo, T. Pensook, S. Amranand, W. Dejdamrongpreecha, S. Jiratawaree, S. Madahin, C. Thongthanawat, S. Amornratanaphan, V. Ruangvanichayakul, PTT Exploration and Production Public Company Ltd.; T. Kreethapon, Carigali-PTTEPI Operating Company Sdn. Bhd.; S. Panthuvichien, C. Sairuk, PTT Exploration and Production Public Company Ltd.
  • Alternate 34729
    From Emissions To Solutions: Exploring First Power Plant CCS In Malaysia
    C. Tan, PETRONAS