Technical Session 09: Advances in Artificial Lift
Wednesday, 28 February
Room 408-409, Level 4
Technical Session
Chairperson
-
1100-1120 34907Production Stabilisation And Enhancement In An Offshore Well Using Dual Gas Lifting In A Single Production String Using Modified Gas Lift Set Up
-
1120-1140 34867Improvement Of Electric Submersible Pumps (esps) Run Life With Aid Of Novel New Technology Addressingsubsurface Scale Deposition.
-
1140-1200 34909Well Completions And Artificial Lift Design, Decarbonised Field Development Plans And Opportunities
-
1200-1220 34898Long Term Exposure Corrosion Risk Evaluation For Optimizing High Power Load Bearing Electrical Submersible Pump Cable Selection
-
Alternate 34823Machine Learning Engine For ESP Condition Monitoring And Failure Prediction
-
Alternate 34814Full Rigless Cable Deployed ESP System-Truly Eliminate Dependency On The Rig When Installing And Retrieving ESP String
-
Alternate 34827Revisiting Production Outlook In A Mature Offshore Field: A Case Study On Exploring Opportunities To Increase Production Using Rigless Techniques
-
Alternate 34870Ultimate Data Acquisition Gaslift Diagnostics Surveillance Technology Succussed To Maximise Wells Productivity And Deepen Poi For The Slugging Unstable Flowing Wells
-
Alternate 34914Investigation And Remediation Plan For Downhole Re-circulation In Rigless Cable Deployed Thru Tubing Electrical Submersible Pumps