Technical Session 21: Facilities and Engineering I
Thursday, 29 February
Room 405, Level 4
Technical Session
-
0900-0920 34905Optimisation Of The Bc Cooler’s Permanent Wind Barrier For Crosswind Negative Effect Reduction
-
0920-0940 34891A Review On Topsides Float-over Configurations (Longitudinal Vs. Transversal) Based On Structural Performance
-
0940-1000 34837New Insights On Ageing Asset With Wave-in Deck Due To Subsidence Challenges
-
1000-1020 34924Study On Follower Structural Strength Analysis Method For Suction Pile Penetration Using Hydraulic Hammering
-
Alternate 34806A Wild Challenge For Installation Of New Structure During Monsoon Period
-
Alternate 34769Technical Challenges Of Plet To Facilitate Deepwater Installation By The S-lay Method In Ls17-2 Development Project
-
Alternate 34803Offshore Wellhead Platform Vent Boom Length Optimisation For Aung Sinkha Field
-
Alternate 34744Spectral Wave Fatigue Assessment Of Shell Penguins Floating Production Storage and Offloading Topside Structure Using Response Amplitude Operators And Sacs