Technical Session 25: Well Intervention
Thursday, 29 February
Room 403-404, Level 4
Technical Session
-
1100-1120 34800Advancing Well Integrity Preservation In Workover Rig Intervention Via Instrumented Coiled Tubing And Through-tubing Inflatable And Retrievable Packer Deployment: A South Kuwait Case Study.
-
1120-1140 34850Improvements To Cementing Operation & Installation Of Cement Packer & Inflatable Cement Retainer For Water Shut-off (WSO) Using Coiled Tubing Unit (CTU)
-
1140-1200 34818First Application Of Innovative Dual-string Barrier Evaluation Tool For Annular Cement Validation In UAE
-
1200-1220 34885Cost-effective Innovation Qualified As Bi-directional Barrier To Support Well Cost Reduction, Eliminate Slickline Operation And Improve Robustness Of Interventionless Systems Application In The Market.
-
Alternate 34742Conveyance Options For Pipe Recovery In A Stuck Drillpipe Scenario In Horizontal Wells
-
Alternate 34793Adaptive Strategy In Execution Of Crown Plug Retrieval At The First Indonesian Deepwater Subsea Workover Campaign
-
Alternate 34755Pushing The Limits Of Coiled Tubing Intervention In Mega-reach Wells: A Success Story Offshore India
-
Alternate 34773Revolutionary Tubing Reconnect System Enables Successful Partial Tubing Replacement For Workover Operation