Technical Session 34: Challenges in Well Construction
Thursday, 29 February
Room 403-404, Level 4
Technical Session
Chairperson
-
1600-1620 34957Navigating Geological Uncertainties: A Comprehensive Approach For Horizontal Well Placement Success Within Complex Deep-water Reservoirs.
-
1620-1640 34969Holistic And Structured Approach For Managing Drilling Limiters Improves Average Well Duration By 20% And Eliminates Wellbore Instability Problems - A Case History Of Successful Implementation Of New Technologies And Operational Practices In Offshore Malaysia
-
1640-1700 34935Changing The Game: Liner Hanger Running And Setting Using An Integrated Acoustic Telemetry Network
-
1700-1720 34931Wellhead And Casing Hanger With Hydraulic Features To Run And Operate Downhole Casing Isolation Valve; Design And Experiences Based On Actual Installation Successes
-
Alternate 34964Localised Wear In Steel, Glass Fiber And Composite Casings Upon Drillstring Contact: A Full-Scale Experimental Comparison
-
Alternate 34946Drillpipe Conveyed Casing And Cement Evaluation Allows For Acquisition Of Critical Measurements In Parallel With Existing Well Operations
-
Alternate 34963Revolutionising Cement Evaluation In Mexico's Exploration Wells: Unleashing The Power Of Extreme Ultrasonic Technology
-
Alternate 34982Impact Of Gas Hydrate Below The Mud Line On Wellbore Stability: A Temperature Simulation Approach