Skip to main content
Loading

Technical Session 39: Paving the Way to Success with Innovative Completion Strategies and New Technologies

Friday, 1 March
Room 403-404, Level 4
Technical Session
Chairperson
Noppanan Nopsiri, Senior Engineer, Well Engineering - PTT Exploration and Production Public Company Ltd.
Mohd Farris Bakar - Petronas
  • 0900-0920 34636
    Cost Optimisation Using Interventionless Packer Setting Device For HPHT Well
    C. Robertson, Precision Oiltools
  • 0920-0940 34654
    Successful Installation Polymer Screen As Primary Sand Control In Onshore And First Stackable System In Offshore Field, East Kalimantan, Indonesia
    A. Mahardhini, W. Warno, S.A. Pratomo, W. Yahya, Pertamina Hulu Kalimantan Timur; F.C. Atmanindar, P. Adinda, M.R. Soeparmono, Pertamina Hulu Sanga Sanga
  • 1000-1020 34678
    Pre-Installed Cable Protectors Can Reduce RIH Time For Completions
    J. Bibby, Vallourec
  • Alternate 34689
    World’s First “Fishbone” Openhole Gravel Packing Using Shunted Gravel-pack System: A Case History From Bohai Bay, China
    Y. Liu, SLB IPM-SPM; N. Moses, M. Teoh Chia Mei, G. Zhao, X. Liu, SLB
  • Alternate 34558
    Successful Implementation Of Innovative Open Hole Completion Technologies For The Longest Erd Well In The Western Offshore Field In India
    A. Ranjan, Halliburton Offshore Services Inc.; A. Misra, A. Ranjan, S. Bhosale, Cairn Oil & Gas, Vedanta Ltd.; V. Kumar, P.K. Bharati, K. Kanakarajan, Halliburton Offshore Services Inc.; J.L. Sadare, Weatherford Middle East
  • Alternate 34658
    Application Of Autonomous Flow Control Devices To Optimise Three Simultaneous Operations In Monobore Wells In Offshore China
    M. Moradi, Tendeka BV; S. Xiong, C. Wei, D. Luo, CNOOC China Ltd. Shenzhen
  • Alternate 34688
    Completion And Workover Riser String Qualification For HPHT Applications
    L. Karlapalem, J. Weise, A. Muradov, NOV Grant Prideco; D. Snarheim, TechnipFMC

OUR SPONSORS AND PARTNERS